Sign In
Data Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.Com
  • Home
  • Cloud & Hybrid Solutions
  • Compute, Storage & Networking
  • Cooling & Infrastructure
  • Data Center Design & Construction
  • Edge Computing
  • Energy & Sustainability
  • Investment & Market Trends
  • Operations & Management
  • Power Systems & Backup
  • Telecoms & Connectivity
Reading: Santee Cooper Launches Bold Plan to Complete Nuclear Power Units for AI Data Center Demands
Share
Data Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.ComData Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.Com
Font ResizerAa
  • Cloud & Hybrid Solutions
  • Compute, Storage & Networking
  • Cooling & Infrastructure
  • Data Center Design & Construction
  • Edge Computing
  • Energy & Sustainability
  • Investment & Market Trends
  • Operations & Management
  • Power Systems & Backup
  • Telecoms & Connectivity
Search
  • Home
  • Cloud & Hybrid Solutions
  • Compute, Storage & Networking
  • Cooling & Infrastructure
  • Data Center Design & Construction
  • Edge Computing
  • Energy & Sustainability
  • Investment & Market Trends
  • Operations & Management
  • Power Systems & Backup
  • Telecoms & Connectivity
Follow US
© DataCenterWires.Com. All Rights Reserved.
Data Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.Com > Blog > Power Systems & Backup > Santee Cooper Launches Bold Plan to Complete Nuclear Power Units for AI Data Center Demands
Power Systems & Backup

Santee Cooper Launches Bold Plan to Complete Nuclear Power Units for AI Data Center Demands

EditorialTeam
Last updated: January 25, 2025 1:13 pm
EditorialTeam
Share
Santee Cooper Launches Bold Plan to Complete Nuclear Power Units for AI Data Center Demands | Image Credit : santeecooper.com
Santee Cooper Launches Bold Plan to Complete Nuclear Power Units for AI Data Center Demands | Image Credit : santeecooper.com
SHARE

Santee Cooper, South Carolina’s state-owned electric and water utility, has launched a Request for Proposals (RFP) to explore options for acquiring and completing two partially constructed generating units at the Virgil C. Summer Nuclear Power Station. This strategic move aims to address the growing energy demands driven by advanced manufacturing, AI-driven data centers, and the tech industry’s emphasis on zero-carbon targets.

Contents
Santee Cooper’s RFP for Nuclear Power StationWhat is the Virgil C. Summer Nuclear Power Station?Why Revive the Nuclear Units?The Role of Nuclear Energy in Meeting Data Center Power DemandsPotential for Accelerated Nuclear Plant TimelinesThe Economic and Environmental Impact of Nuclear PowerFAQ SectionWhat is the goal of Santee Cooper’s RFP for the Virgil C. Summer Nuclear Power Station?Why is nuclear energy gaining attention from the data center industry?What impact will the revival of these nuclear units have on South Carolina’s energy grid?How does Santee Cooper plan to accelerate the construction timeline?How are other companies integrating nuclear energy into their operations?

Santee Cooper’s RFP for Nuclear Power Station

In a bid to meet increasing energy demands, Santee Cooper has contracted Centerview Partners LLC to conduct an RFP for potential partners interested in acquiring the project or proposing alternatives to complete the two nuclear units. Responses to this RFP are due by May 5, 2025.

What is the Virgil C. Summer Nuclear Power Station?

The Virgil C. Summer Nuclear Power Station, located in Fairfield County, South Carolina, currently operates a single unit with a capacity of 973MW. The original expansion, which began in 2008, aimed to add two 1.1GW AP1000 pressurized water reactors. However, after a series of delays and financial challenges, including the bankruptcy of Westinghouse in 2017, the project was abandoned. Now, Santee Cooper sees an opportunity to revive these units, potentially delivering 2.2GW of carbon-free nuclear power.

Why Revive the Nuclear Units?

The decision to revive the project stems from multiple factors, including the increased need for clean, reliable energy to power AI-driven data centers and advanced manufacturing. According to Santee Cooper’s CEO, Jimmy Staton, the tech industry’s demand for zero-emissions energy solutions has created a unique opportunity to fast-track the completion of these nuclear units. The location, infrastructure, and access to water make it feasible to complete the project on a shortened timeline.

The Role of Nuclear Energy in Meeting Data Center Power Demands

The energy demands from AI and other data-intensive industries have made nuclear energy a more attractive option due to its low-carbon and reliable nature. The growing interest in nuclear power for data centers is reflected by recent deals such as Microsoft’s long-term agreement with the Three Mile Island Nuclear Power Plant, and AWS’s acquisition of a data center campus near the Susquehanna Steam Electric Station. Additionally, Meta has launched an RFP for 1.4GW of new nuclear capacity, underscoring the increasing reliance on nuclear to power data centers.

Potential for Accelerated Nuclear Plant Timelines

The two proposed units at the VC Summer Nuclear Power Station could add 2.2GW of nuclear capacity to the grid. The site’s nuclear security envelope, along with its existing infrastructure and available land and water, offers significant potential for an accelerated construction timeline. Santee Cooper’s ability to integrate the new units with existing transmission infrastructure further enhances the feasibility of this ambitious project.

The Economic and Environmental Impact of Nuclear Power

Reviving these nuclear units not only supports the growing data center industry but also contributes to the state’s clean energy goals. Nuclear power, with its capacity for baseload generation and zero-carbon emissions, presents a vital solution for balancing the growing need for power with the environmental imperative to reduce carbon footprints. Santee Cooper’s exploration of nuclear energy underscores its commitment to providing reliable, carbon-free electricity to its customers.


FAQ Section

What is the goal of Santee Cooper’s RFP for the Virgil C. Summer Nuclear Power Station?

The RFP aims to explore options for acquiring and completing two partially constructed nuclear units at the Virgil C. Summer Nuclear Power Station. The goal is to address increasing energy demands from industries like AI-driven data centers while providing a low-carbon power source.

Why is nuclear energy gaining attention from the data center industry?

Nuclear energy offers a reliable, low-carbon solution to meet the growing energy demands of data centers, which are driven by technologies like AI. Nuclear power is seen as a sustainable and scalable energy source to support the needs of data centers while reducing carbon emissions.

What impact will the revival of these nuclear units have on South Carolina’s energy grid?

The revival of these units could add 2.2GW of reliable, zero-emissions power to South Carolina’s grid, supporting both local energy needs and the growing demand from tech industries. This would contribute significantly to the state’s clean energy goals.

How does Santee Cooper plan to accelerate the construction timeline?

Santee Cooper’s access to existing infrastructure, land, water, and nuclear security envelopes at the VC Summer site makes it feasible to accelerate the construction timeline for the two nuclear units. This strategic location helps streamline the process.

How are other companies integrating nuclear energy into their operations?

Tech giants like Microsoft, AWS, and Meta are increasingly turning to nuclear energy to power their operations. Microsoft has signed long-term agreements with nuclear plants, while AWS and Meta are exploring similar deals to meet their energy needs in an environmentally responsible manner.

Subscribe for latest news round-ups, market reports, and more

TAGGED:accelerating nuclear energy projects for data centersAI data center energy demandsclean energy solutions for data centersenergy solutions for AI data centersfuture of nuclear energy for data centersnuclear energy for tech industrynuclear power for AI-driven operationsnuclear power stations for tech industryreviving nuclear energy for data centersSantee Cooper nuclear power acquisitionSantee Cooper RFP nuclear unitszero-carbon nuclear energy for data centers
Share This Article
Facebook Twitter Flipboard Whatsapp Whatsapp LinkedIn Reddit Email Copy Link
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Surprise0
Dead0
Wink0
By EditorialTeam
Follow:
The Data Center Wires Editorial Team brings you expert insights and the latest updates on energy, cooling, power systems, cloud solutions, edge computing, and more. We deliver reliable, concise, and actionable content to keep you informed and ahead in the data center industry.
Previous Article Former CareFirst Data Center in Maryland Listed for $12.78 Million, Featuring Scalable Power and 4.5MW Backup | Image Credit : loopnet.com Former CareFirst Data Center in Maryland Listed for $12.78 Million, Featuring Scalable Power and 4.5MW Backup
Next Article Hertfordshire’s £3.75bn 320MW Data Center Given Green Light, Set to Boost UK’s Digital Economy | Image Credit :dc01uk.com Hertfordshire’s £3.75bn 320MW Data Center Given Green Light, Set to Boost UK’s Digital Economy
SpinLaunch Skyrockets with New Funding and Bold LEO Satellite Vision: “Dozens of Terabits” Ahead
SpinLaunch Skyrockets with New Funding and Bold LEO Satellite Vision: “Dozens of Terabits” Ahead
Blog
BitFuFu Acquires 51MW Bitcoin Mining Data Center in Oklahoma
BitFuFu Acquires 51MW Bitcoin Mining Data Center in Oklahoma
Investment & Market Trends
T-Mobile Chooses Red Hat to Supercharge Its Telco Cloud with Automation
T-Mobile Chooses Red Hat to Supercharge Its Telco Cloud with Automation
Telecoms & Connectivity
Nokia Set to Finalize $2.3 Billion Infinera Acquisition by February-End
Nokia Set to Finalize $2.3 Billion Infinera Acquisition by February-End
Compute, Storage & Networking
Alibaba Cloud Launches Mexico Cloud Region
Alibaba Cloud Launches Mexico Cloud Region: Expanding Digital Infrastructure in Latin America
Telecoms & Connectivity
Global Climate Change Fuels Extreme Weather Iraq’s Energy Sector Faces Severe Risks from Rising Temperatures and Shifting Weather Patterns
Global Climate Change Fuels Extreme Weather: Iraq’s Energy Sector Faces Severe Risks from Rising Temperatures and Shifting Weather Patterns
Current Trends
Meta Launches $800 Million Data Center in Mesa, Arizona, With Expansions Focused on AI and Sustainability
Meta Launches $800 Million Data Center in Mesa, Arizona, With Expansions Focused on AI and Sustainability
Data Center Design & Construction
DataBank Raises $250M from TJC Amid $600M Secondary Share Offering to Drive Digital Infrastructure Growth
DataBank Raises $250M from TJC Amid $600M Secondary Share Offering to Drive Digital Infrastructure Growth
Investment & Market Trends
Blackstone Defends $80 Billion Data Center Strategy as DeepSeek Disruption Reshapes AI Infrastructure
Blackstone Defends $80 Billion Data Center Strategy as “DeepSeek Disruption” Reshapes AI Infrastructure
Investment & Market Trends
Data Center M&A Deals Hit Record $73 Billion in 2024, AirTrunk Acquisition Sets Historic Benchmark
Data Center M&A Deals Hit Record $73 Billion in 2024, AirTrunk Acquisition Sets Historic Benchmark
Investment & Market Trends

Subscribe Us !

You Might Also Like

Stargate AI Data Center to Feature $500M, 360.5MW Natural Gas Plant in Texas
Power Systems & Backup

Stargate AI Data Center to Feature $500M, 360.5MW Natural Gas Plant in Texas

Developers of the first Stargate AI data center in Abilene, Texas, have submitted an application to build a natural gas…

4 Min Read
NextEra Partners with GE Vernova to Power Data Centers with Gas and Renewables, Plans Iowa Nuclear Plant Restart by 2028
Power Systems & Backup

NextEra Partners with GE Vernova to Power Data Centers with Gas and Renewables, Plans Iowa Nuclear Plant Restart by 2028

NextEra's Strategic Moves to Address Growing Data Center Energy Demand NextEra Energy, a leading U.S. energy generator, has forged a…

5 Min Read
Georgia PSC Approves New Rule Requiring Data Centers to Pay Transmission Costs
Power Systems & Backup

Georgia PSC Approves New Rule Requiring Data Centers to Pay Transmission Costs

The Georgia Public Service Commission (PSC) has approved a groundbreaking rule that impacts large-load customers, including data centers, using over…

5 Min Read
Susquehanna Nuclear Challenges FERC Ruling Blocking Power Boost for AWS Data Center
Power Systems & Backup

Susquehanna Nuclear Challenges FERC Ruling Blocking Power Boost for AWS Data Center

Susquehanna Nuclear Seeks Court Review of Rejected ISA Susquehanna Nuclear LLC has filed a petition with the Fifth Circuit Court…

5 Min Read

About Us

Welcome to DataCenterWires.com, your trusted source for the latest news, insights, and analysis in the data center industry. As the global data infrastructure continues to grow and evolve, we are dedicated to providing timely, accurate, and in-depth coverage of the critical issues shaping the future of data centers.

On Data Center wires

  • Cloud & Hybrid Solutions
  • Compute, Storage & Networking
  • Cooling & Infrastructure
  • Data Center Design & Construction
  • Edge Computing
  • Energy & Sustainability
  • Investment & Market Trends
  • Operations & Management
  • Power Systems & Backup
  • Telecoms & Connectivity

Helpful links

  • Ethics Policy
  • Editorial Guidelines
  • Disclaimer
  • Corrections Policy
  • Advertise with Us
  • About Us
  • Cookie Policy
  • Terms & Conditions

Data Center Tools

  • Cooling Efficiency Calculator
  • Power Usage Effectiveness (PUE) Calculator
  • Energy Cost Calculator
  • Carbon Emissions Calculator
  • Data Center Density Calculator
  • Data Center Uptime Calculator (MTBF & MTTR)
  • Data Center Load Balancing Calculator
  • Backup Power Calculator (UPS Sizing)
  • Server Racks Capacity Calculator
  • Data Center Risk Assessment Tool
  • Data Center Sustainability Optimizer
Data Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.Com

Connect us on Facebook, BlueSky, Linkedin and Twitter, for any queries you can use this link – Contact

Active On

Facebook Twitter Youtube

© DataCenterWires.Com. All Rights Reserved.

Go to mobile version
Welcome Back!

Sign in to your account

Lost your password?