Sign In
Data Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.Com
  • Home
  • Cloud & Hybrid Solutions
  • Compute, Storage & Networking
  • Cooling & Infrastructure
  • Data Center Design & Construction
  • Edge Computing
  • Energy & Sustainability
  • Investment & Market Trends
  • Operations & Management
  • Power Systems & Backup
  • Telecoms & Connectivity
Reading: NextEra Partners with GE Vernova to Power Data Centers with Gas and Renewables, Plans Iowa Nuclear Plant Restart by 2028
Share
Data Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.ComData Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.Com
Font ResizerAa
  • Cloud & Hybrid Solutions
  • Compute, Storage & Networking
  • Cooling & Infrastructure
  • Data Center Design & Construction
  • Edge Computing
  • Energy & Sustainability
  • Investment & Market Trends
  • Operations & Management
  • Power Systems & Backup
  • Telecoms & Connectivity
Search
  • Home
  • Cloud & Hybrid Solutions
  • Compute, Storage & Networking
  • Cooling & Infrastructure
  • Data Center Design & Construction
  • Edge Computing
  • Energy & Sustainability
  • Investment & Market Trends
  • Operations & Management
  • Power Systems & Backup
  • Telecoms & Connectivity
Follow US
© DataCenterWires.Com. All Rights Reserved.
Data Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.Com > Blog > Power Systems & Backup > NextEra Partners with GE Vernova to Power Data Centers with Gas and Renewables, Plans Iowa Nuclear Plant Restart by 2028
Power Systems & Backup

NextEra Partners with GE Vernova to Power Data Centers with Gas and Renewables, Plans Iowa Nuclear Plant Restart by 2028

EditorialTeam
Last updated: January 29, 2025 7:44 am
EditorialTeam
Share
NextEra Partners with GE Vernova to Power Data Centers with Gas and Renewables, Plans Iowa Nuclear Plant Restart by 2028
NextEra Partners with GE Vernova to Power Data Centers with Gas and Renewables, Plans Iowa Nuclear Plant Restart by 2028
SHARE

NextEra’s Strategic Moves to Address Growing Data Center Energy Demand

NextEra Energy, a leading U.S. energy generator, has forged a partnership with GE Vernova to meet the rising energy demands of data centers through gas-fired generation. The two companies aim to collaborate over the next four years, focusing on large-load customers, including those in data centers, reshoring manufacturing, and electrifying industries. This initiative, announced alongside NextEra’s fourth-quarter financials, seeks to integrate gas, renewable energy, and storage solutions.

Contents
NextEra’s Strategic Moves to Address Growing Data Center Energy DemandNextEra and GE Vernova’s Gas-Fired Generation CollaborationDelivering Integrated Solutions for High-Energy DemandsRestarting Iowa’s Duane Arnold Energy Center: A Nuclear Power Solution for Data CentersNextEra’s Commitment to Diversified Power GenerationThe Growing Role of Natural Gas in Meeting Data Center Energy NeedsNatural Gas as a Bridge to Sustainable Energy Solutions

NextEra and GE Vernova’s Gas-Fired Generation Collaboration

Delivering Integrated Solutions for High-Energy Demands

NextEra’s collaboration with GE Vernova will focus on creating integrated energy solutions for data centers. The partnership plans to offer gas-fired generation, combined with renewable energy and storage options. These solutions will be co-owned by the companies and offered through long-term contracts to customers. The partnership aims to serve a variety of customers, including investor-owned utilities, municipalities, and commercial sectors.

John Ketchum, CEO of NextEra, highlighted that this collaboration has the potential to support multiple gigawatts of capacity, addressing the urgent energy needs of the data center industry and other high-demand sectors. This move aligns with NextEra’s vision of enhancing energy infrastructure to support the electrification of industry and growing demand.

Restarting Iowa’s Duane Arnold Energy Center: A Nuclear Power Solution for Data Centers

NextEra’s Commitment to Diversified Power Generation

NextEra is also taking significant steps to restart the Duane Arnold Energy Center, a nuclear power plant in Iowa. The plant, which operated for 45 years before shutting down in 2020, is expected to resume operations by 2028, pending approval from the Nuclear Regulatory Commission. While the exact role the plant will play in powering data centers remains to be seen, it is likely that it will contribute to meeting the increasing energy demands of the sector.

John Ketchum emphasized that the restart of Duane Arnold will have a limited immediate impact but will complement other renewable and gas-powered solutions in the longer term. The company views this nuclear energy source as a vital addition to its “all of the above” energy strategy, balancing renewables, storage, and natural gas.

The Growing Role of Natural Gas in Meeting Data Center Energy Needs

Natural Gas as a Bridge to Sustainable Energy Solutions

Natural gas is becoming an increasingly important part of the energy mix for powering data centers. As demand for electricity soars, many energy generators are turning to natural gas to provide reliable power during periods of peak demand. NextEra’s gas-fired generation plans reflect this shift, as the company integrates natural gas with renewables and storage systems to offer stable and scalable energy solutions.

This growing reliance on natural gas is not unique to NextEra. Several energy providers are adopting hybrid energy models, which include natural gas as a temporary bridge to cleaner, more sustainable energy sources like small modular reactors (SMRs). This approach provides immediate power while facilitating a transition to more advanced and sustainable technologies over time.


FAQ Section

  1. What is NextEra Energy’s partnership with GE Vernova about?
    NextEra Energy has partnered with GE Vernova to develop gas-fired generation solutions for high-energy-demand sectors like data centers. The collaboration will include a mix of gas, renewables, and storage to provide reliable energy.
  2. When will the Duane Arnold Energy Center be restarted?
    The Duane Arnold Energy Center is expected to restart operations by the end of 2028, subject to approval from the Nuclear Regulatory Commission. The plant could help meet the growing energy needs of data centers.
  3. How will natural gas support data center energy needs?
    Natural gas provides a reliable and scalable energy solution for data centers, especially during peak demand periods. It is being integrated with renewable energy and storage systems to ensure stable power supply.
  4. What is the role of renewable energy in NextEra’s energy strategy?
    NextEra’s strategy includes integrating renewable energy, gas-fired generation, and storage to meet the increasing demand for energy, particularly in sectors like data centers and manufacturing.
  5. Why is NextEra focusing on gas-fired generation and nuclear energy?
    NextEra is focusing on these energy sources to provide a balanced, reliable, and sustainable power mix. Gas-fired generation will address short-term energy needs, while nuclear energy from Duane Arnold will contribute long-term capacity.

Subscribe for latest news round-ups, market reports, and more

TAGGED:Duane Arnold Energy Center nuclear restart 2028Gas-fired generation for data centersNatural gas in data center energy supplyNextEra Energy nuclear power plant restartRenewable energy solutions for large-load customers
Share This Article
Facebook Twitter Flipboard Whatsapp Whatsapp LinkedIn Reddit Email Copy Link
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Surprise0
Dead0
Wink0
By EditorialTeam
Follow:
The Data Center Wires Editorial Team brings you expert insights and the latest updates on energy, cooling, power systems, cloud solutions, edge computing, and more. We deliver reliable, concise, and actionable content to keep you informed and ahead in the data center industry.
Previous Article Man Arrested After 'Shut the System' Activists Sabotage Fiber Optic Cables Targeting UK Insurance Firms Man Arrested After ‘Shut the System’ Activists Sabotage Fiber Optic Cables Targeting UK Insurance Firms
Next Article Verizon Launches AI Network Solution 'Reimagined Assets' Fuel Scalable AI Workloads with Vultr and Meta Verizon Launches AI Network Solution: ‘Reimagined Assets’ Fuel Scalable AI Workloads with Vultr and Meta
SpinLaunch Skyrockets with New Funding and Bold LEO Satellite Vision: “Dozens of Terabits” Ahead
SpinLaunch Skyrockets with New Funding and Bold LEO Satellite Vision: “Dozens of Terabits” Ahead
Blog
BitFuFu Acquires 51MW Bitcoin Mining Data Center in Oklahoma
BitFuFu Acquires 51MW Bitcoin Mining Data Center in Oklahoma
Investment & Market Trends
T-Mobile Chooses Red Hat to Supercharge Its Telco Cloud with Automation
T-Mobile Chooses Red Hat to Supercharge Its Telco Cloud with Automation
Telecoms & Connectivity
Nokia Set to Finalize $2.3 Billion Infinera Acquisition by February-End
Nokia Set to Finalize $2.3 Billion Infinera Acquisition by February-End
Compute, Storage & Networking
Alibaba Cloud Launches Mexico Cloud Region
Alibaba Cloud Launches Mexico Cloud Region: Expanding Digital Infrastructure in Latin America
Telecoms & Connectivity
Global Climate Change Fuels Extreme Weather Iraq’s Energy Sector Faces Severe Risks from Rising Temperatures and Shifting Weather Patterns
Global Climate Change Fuels Extreme Weather: Iraq’s Energy Sector Faces Severe Risks from Rising Temperatures and Shifting Weather Patterns
Current Trends
Meta Launches $800 Million Data Center in Mesa, Arizona, With Expansions Focused on AI and Sustainability
Meta Launches $800 Million Data Center in Mesa, Arizona, With Expansions Focused on AI and Sustainability
Data Center Design & Construction
DataBank Raises $250M from TJC Amid $600M Secondary Share Offering to Drive Digital Infrastructure Growth
DataBank Raises $250M from TJC Amid $600M Secondary Share Offering to Drive Digital Infrastructure Growth
Investment & Market Trends
Blackstone Defends $80 Billion Data Center Strategy as DeepSeek Disruption Reshapes AI Infrastructure
Blackstone Defends $80 Billion Data Center Strategy as “DeepSeek Disruption” Reshapes AI Infrastructure
Investment & Market Trends
Data Center M&A Deals Hit Record $73 Billion in 2024, AirTrunk Acquisition Sets Historic Benchmark
Data Center M&A Deals Hit Record $73 Billion in 2024, AirTrunk Acquisition Sets Historic Benchmark
Investment & Market Trends

Subscribe Us !

You Might Also Like

Stargate AI Data Center to Feature $500M, 360.5MW Natural Gas Plant in Texas
Power Systems & Backup

Stargate AI Data Center to Feature $500M, 360.5MW Natural Gas Plant in Texas

Developers of the first Stargate AI data center in Abilene, Texas, have submitted an application to build a natural gas…

4 Min Read
Georgia PSC Approves New Rule Requiring Data Centers to Pay Transmission Costs
Power Systems & Backup

Georgia PSC Approves New Rule Requiring Data Centers to Pay Transmission Costs

The Georgia Public Service Commission (PSC) has approved a groundbreaking rule that impacts large-load customers, including data centers, using over…

5 Min Read
Susquehanna Nuclear Challenges FERC Ruling Blocking Power Boost for AWS Data Center
Power Systems & Backup

Susquehanna Nuclear Challenges FERC Ruling Blocking Power Boost for AWS Data Center

Susquehanna Nuclear Seeks Court Review of Rejected ISA Susquehanna Nuclear LLC has filed a petition with the Fifth Circuit Court…

5 Min Read
Santee Cooper Launches Bold Plan to Complete Nuclear Power Units for AI Data Center Demands | Image Credit : santeecooper.com
Power Systems & Backup

Santee Cooper Launches Bold Plan to Complete Nuclear Power Units for AI Data Center Demands

Santee Cooper, South Carolina’s state-owned electric and water utility, has launched a Request for Proposals (RFP) to explore options for…

6 Min Read

About Us

Welcome to DataCenterWires.com, your trusted source for the latest news, insights, and analysis in the data center industry. As the global data infrastructure continues to grow and evolve, we are dedicated to providing timely, accurate, and in-depth coverage of the critical issues shaping the future of data centers.

On Data Center wires

  • Cloud & Hybrid Solutions
  • Compute, Storage & Networking
  • Cooling & Infrastructure
  • Data Center Design & Construction
  • Edge Computing
  • Energy & Sustainability
  • Investment & Market Trends
  • Operations & Management
  • Power Systems & Backup
  • Telecoms & Connectivity

Helpful links

  • Ethics Policy
  • Editorial Guidelines
  • Disclaimer
  • Corrections Policy
  • Advertise with Us
  • About Us
  • Cookie Policy
  • Terms & Conditions

Data Center Tools

  • Cooling Efficiency Calculator
  • Power Usage Effectiveness (PUE) Calculator
  • Energy Cost Calculator
  • Carbon Emissions Calculator
  • Data Center Density Calculator
  • Data Center Uptime Calculator (MTBF & MTTR)
  • Data Center Load Balancing Calculator
  • Backup Power Calculator (UPS Sizing)
  • Server Racks Capacity Calculator
  • Data Center Risk Assessment Tool
  • Data Center Sustainability Optimizer
Data Center News | Infrastructure Management | Construction | AI DATA | DataCenterWires.Com

Connect us on Facebook, BlueSky, Linkedin and Twitter, for any queries you can use this link – Contact

Active On

Facebook Twitter Youtube

© DataCenterWires.Com. All Rights Reserved.

Go to mobile version
Welcome Back!

Sign in to your account

Lost your password?