Spencer Building Carrier Hotel (SBCH) is undergoing a significant expansion of its data center in Toronto, Canada. The facility, part of the Harbour Centre Complex, plans to introduce two new data halls on the Spencer Building’s sixth floor. This addition will bring 5MW of power capacity and 23,000 square feet of contiguous space, complementing the existing 3MW already utilized within the Harbour Centre.
Flexible Build-to-Suit Configurations
Data Hall 1 Available Now
The first data hall, providing 2.5MW of power, is designed with flexible build-to-suit configurations. These customizable options include scalable power setups of up to 40kW per cabinet, making it an attractive choice for enterprises with diverse needs. The facility is currently available for concurrent build-out.
Data Hall 2 Scheduled for 2027
The second data hall, also offering 2.5MW of capacity, is slated for completion in 2027. Once operational, it will further enhance the Spencer Building’s ability to meet the growing demands of businesses requiring reliable data center solutions.
Meeting Growing Data Demands
“Today’s businesses, whether global enterprises, cloud providers, AI developers, carriers, or other industries, face a dual challenge of escalating data demands and rising costs for data center services,” said Scott Despot, director of business development and sales at SBCH. “That’s why we’re thrilled to offer new, customizable data center options within the Spencer Building, redefining what it means to establish a footprint in Vancouver.”
Historic Roots and Modern Innovation
A Historic Building Repurposed
Originally constructed in 1926, the Spencer Building has undergone multiple transformations. It once served as a department store under brands like Spencer, Eaton, and Sears, and later as a downtown campus for Simon Fraser University. Now, the 10MW, 43,000-square-foot (3,995 sqm) facility at 515 West Hastings Street is dedicated to cutting-edge data center operations.
Key Details:
- Location: 515 West Hastings Street, Toronto, Canada
- Current Capacity: 3MW
- Planned Expansion: 5MW (two data halls)
- Total Space: 43,000 sq ft
Expanding Colocation and Connectivity Services
SBCH is also enhancing its service portfolio with the launch of Colo5 and MMR5. Colo5, which debuted last year with 100kW of capacity across 14 racks, offers colocation services. Phase 2 of Colo5 is set to launch in Q1 2025. Meanwhile, MMR5 provides meet-me-room services, strengthening connectivity for data center clients.
Proximity to Carrier Hotels and Other Operators
Located adjacent to an existing carrier hotel, the Spencer Building benefits from its strategic position near the Harbour Centre skyscraper at 555 West Hastings Street. The Harbour Centre, a prominent 28-story building designed by WZMH Architects and opened in 1977, houses several leading data center operators, including Cologix, Cyxtera, Aptum, and eStruxture.
Frequently Asked Questions (FAQ)
1. What is the Spencer Building Carrier Hotel?
The Spencer Building Carrier Hotel is a data center facility located in Toronto, Canada, offering colocation, connectivity, and scalable data center solutions.
2. What is the capacity of the Spencer Building data center?
The facility currently supports 3MW of power, with an additional 5MW planned through the expansion of two new data halls.
3. What services does SBCH offer?
SBCH provides colocation services through Colo5, connectivity options via MMR5, and customizable data center configurations with scalable power capacities.
4. When will the new data halls be operational?
Data Hall 1 is available now for concurrent build-out, while Data Hall 2 is scheduled for completion in 2027.
5. How does the Spencer Building’s location enhance its appeal?
Situated near the Harbour Centre and other carrier hotels, the Spencer Building offers excellent connectivity and proximity to major data center operators, making it a strategic location for businesses.